Wilton Water Works Minutes
May 31, 2006
COMMISSIONERS: Chairperson
Jim Tuttle; Tom Herlihy and Charlie McGettigan.
Jim
Tuttle called the meeting to order at 7:45 p.m.
Minutes – April 26, 2006
MOTION: Herlihy/McGettigan to approve the 4/26/06
minutes as written. All were in favor.
River Crossing: Ben Lundsted, from CEI, presented one bid, from J. Parker &
Daughters, Inc., for phase I and III of the river/ RR crossing project. He said
the specs had been distributed to 12 companies for bidding and the bids were
due on May 24th. There was discussion about this bid and whether to
meet with Mr. Parker.
MOTION: McGettigan/Herlihy to delay action on the
bid for one week. All in favor.
Mr.
Herlihy and Mr. Tuttle will meet on Thursday, June 8th, to go over
the bid. Mr. McGettigan will be out of town.
Mr.
Tuttle explained that because of all the rain, the Highway 101 boring project
will begin in a slightly different place on the Eastview property. He gave the
coordinates to Ben, who will supervise the project.
Rebecca
Balke, with CEI, brought the Engineering Proposal for Construction Services,
dated April 25, 2006, to the Commissioners’ attention. They discussed the
contract, especially the resident inspector. All agreed that there would be
times when the resident inspector would not need to be there and there could be
flexibility with when he/she would be on the job. Mr. Tuttle signed the contract.
Painting Inside of Tank: Mr. Herlihy to contact
Robert Merithew re: whether to have the tank re-inspected before making a
decision about interior painting.
Length of Meetings: The Commissioners discussed paying bills at the end of the
meeting but decided to keep it from 7 to 7:30 p.m.
MOTION: Herlihy/McGettigan to begin the business
meeting at 7:30 p.m. and end at 10 p.m. unless there is a motion and a
unanimous vote to extend the meeting for a stated length of time. All in favor.
Recharge Area: Mr. Herlihy will contact Emory & Garrett Groundwater about
looking at the new gravel district and how it might affect the recharge area of
the wells.
Hydrant Painting: Nick Jowders is interested in painting the hydrants and will do
it after work in
the afternoons and on Saturdays. He is already a Town employee, so
he is insured.
Site Work: Mr. Tuttle reported that he worked at the property on Route 31
S. for 12 days. The Commissioners rented a tractor from Chappel Tractor for 11
days, but because of a couple of problems with the machine, were only charged
for 5 days. The bill came to $2,570, which included $70 for transport of the
unit.
MOTION: Herlihy/McGettigan to adjourn. All in favor. The meeting adjourned at 11:10 p.m.
Submitted
by Diane Nilsson, Clerk
ACTION ITEMS
·
Get year-end financial
report from Carla & check to be sure that all bills to CEI have been paid.
·
Arrange with DOT dates on
which to meet with police, fire, schools, highway, etc. for low salt program
along Route 31 South.
·
Look at list of water users
to see if any are in need of testable backflow devices.
·
Arrange to get the
debris cleaned up at the dry hydrant area at Stockwell Brook Dam.
·
Arrange for
electrician to encase telemetry wires in conduit & install motion detector
at water tank.
·
Purchase the
following items from Granger: secondary containment pallets for 55 gallon
barrels and a 20-gallon chemical spill kit.
·
Get
current copy of plumber’s insurance on file for Porter Plumbing.
Tom Herlihy
·
Contact Merithew
regarding possibly re-inspecting inside of water tank.
·
Call Dan Tinkham at
E & GG re: remaining 4 test well security caps & recharge area.
·
Put together list of
deadlines for annual, semi-annual, monthly etc. reports and tests.
·
Create Emergency
Water Supply Connection plan.
Jim Tuttle
·
Contact PSNH to
relocate transformers at pump station.
·
Test Emergency
Contingency Plan in 2006 per DES.
·
Install testable
backflow devices at the following locations: Fire Station, domestic &
sprinklers; two sewer pump stations; water pump station; hydrant for bulk water
users; two cemeteries; Recycling Center; LA Limo; Bursey’s; Bakery; Dr. Roy’s,
Rantimaki (if needed) & Intervale Rd photographer (if needed).
·
Find domestic and
sprinkler shutoffs at Draper Energy.
·
Come up with revised
rules & regulations after reviewing those of similarly sized towns. These
to include standardized costs for bringing new service to residences and
businesses as well as costs for meter installations, among other things.
·
Legal document – 40
Madison Street.
·
Replace 3
left-handed valves on Abbot Hill Acres Road.
·
Paint inside of
water tank before 2006.
·
Retrofit pump at
Everett well.
·
Install 8” main on
Intervale Road
·
Locate site for
second water tank.
<Back to Wilton Water Works Home Page>