Wilton Water Works Minutes
April 26, 2006
COMMISSIONERS: Chairperson
Jim Tuttle; Tom Herlihy and Charlie McGettigan.
Jim
Tuttle called the meeting to order at 8:30 p.m.
Minutes – April 5, 2006
MOTION: Herlihy/Tuttle to approve the 4/5/06
minutes as written. Two were in favor.
Mr. McGettigan abstained.
River Crossing:
Ben Lundsted, from CEI, presented plans and specs for phases I and III of the
river/ RR crossing
project. He said they had been distributed to 12 companies for bidding and the
bids are due back May 24th. CEI will screen the bids and present the
lowest two or three to the Commissioners.
He said that Phase II is ready to start in mid-May. Ben also presented a
scope of services from CEI that included contract administration, construction inspection
services and preparation of record documents including as-built plans as
needed.
PSNH: Mr. Tuttle said that Pierce Rigrod, with DES,
felt that the power lines are part of the integrity of the pump station and
that the transformers should stay where they are so that he could see them
leaking. Ben will take that information to Rebecca Balke at CEI, and she may
contact Mr. Rigrod.
NewSpartan Subdivision: Dawn Tuomala and Tom Quinn
presented plans for the water services for the 16 house cluster subdivision
called “Riverwalk.” The Commissioners made suggestions for some changes.
Main Street Services: Ms. Tuomala gave the
Commissioners a map of the service connections for the businesses on Main
Street.
Pennichuck Water Service: Will start May 15th.
Cost of New Water Connection: The Commissioners discussed a
motion made at the last meeting, but tabled until this meeting, so that Mr. McGettigan
could be part of the discussion and the vote:
MOTION: Tuttle/Herlihy to increase the cost of new
connections, for 1” to 2” services, to $1,500,
from the present $1,000. Services over 2” would be determined based on
materials required. The connection fee will include the water meter, which will
continue to be owned by the Water Dept., but will not include the parts required
for the installation of the meter. Tapping the water main and bringing service
to the property line or curb box will be billed to the customer on a time and
material basis.
Mr.
McGettigan objected to raising the fee to join the system as well as charging
people time & materials for bringing service to their property line.
MOTION: Herlihy/Tuttle to amend the motion to
increase the cost of a new connection to $1,200, instead of $1,500, and to add
the sentence: Nothing less than 1” copper service in the street. The rest of
the motion remains unchanged. All were in favor.
Painting Inside of Tank: Mr. McGettigan felt strongly that before the
Commissioners spent $75,000
to paint the tank they should talk to Steve Densberger at Pennichuck.
They agreed to put off making a
decision until after speaking with him.
Planning Board & Gravel
Ordinance: Mr. Tuttle said that the PB scheduled a work session for
Wednesday May 3rd at 7:30 p.m. to discuss the issue.
MOTION: Tuttle/Herlihy to
adjourn the meeting. All in favor. The meeting
adjourned at 11:15 p.m.
Submitted by Diane Nilsson, Clerk
ACTION ITEMS
·
Get year-end financial report
from Carla & check to be sure that all bills to CEI have been paid.
·
Arrange with DOT dates on
which to meet with police, fire, schools, highway, etc. for low salt program
along Route 31 South.
·
Look at list of water users to
see if any are in need of testable backflow devices.
·
Arrange to get the
debris cleaned up at the dry hydrant area at Stockwell Brook Dam.
·
Arrange for electrician
to encase telemetry wires in conduit & install motion detector at water
tank.
·
Purchase the following
items from Granger: secondary containment pallets for 55 gallon barrels and a
20-gallon chemical spill kit.
·
Get current
copy of plumber’s insurance on file for Porter Plumbing.
Tom Herlihy
·
Call Dan Tinkham at E
& GG re: remaining 4 test well security caps.
·
Put together list of
deadlines for annual, semi-annual, monthly etc. reports and tests.
·
Create Emergency Water
Supply Connection plan.
Jim Tuttle
·
Contact PSNH to
relocate transformers at pump station.
·
Test Emergency
Contingency Plan in 2006 per DES.
·
Install testable
backflow devices at the following locations: Fire Station, domestic &
sprinklers; two sewer pump stations; water pump station; hydrant for bulk water
users; two cemeteries; Recycling Center; LA Limo; Bursey’s; Bakery; Dr. Roy’s,
Rantimaki (if needed) & Intervale Rd photographer (if needed).
·
Find domestic and
sprinkler shutoffs at Draper Energy.
·
Come up with revised
rules & regulations after reviewing those of similarly sized towns. These
to include standardized costs for bringing new service to residences and
businesses as well as costs for meter installations, among other things.
·
Legal document – 40
Madison Street.
·
Replace 3 left-handed
valves on Abbot Hill Acres Road.
·
Paint inside of water
tank before 2006.
·
Retrofit pump at
Everett well.
·
Install 8” main on
Intervale Road
·
Locate site for second
water tank.