As
of
The
cost of a new connection for a 1” to 2” service is $1,200. Services over
2” will be determined based on materials required. The connection fee will
include the water meter, which will continue to be owned by the Water Dept.,
but will not include the parts required for the installation of the meter.
Tapping the water main and bringing service to the property line, or curb
box, will be billed to the customer on a time and materials basis.
Nothing
less than 1” copper will be allowed in the street.