Town of WiltonNew Hampshire

OFFICE OF THE BUILDING INSPECTOR

BUILDING PERMIT GUIDELINE
 

 

Documentation Required 4

Document on file44

*** All Documents from Box A must be handed in with the permit application.

Name__________________________Tax Map______Lot________________

Box A -REQUIRED FOR A BUILDING PERMIT


 
$
Septic Authorization to Build (issued by State)
$
Plot Plan Showing Placement of Structure
$
Building Permit and Drawings, and Ownership Docs
$
Driveway Permit

Box B –REQUIRED FOR OCCUPANCY PERMIT


 
All from Box A
*
Fuel Storage Permit (over 100 gallon capacity)
*
Burner Permit Inspection 
$
Septic Authorization to Use (issued by State)
$
Plot Plan Showing Placement of Fuel Storage
$
Electrical Permit, Request for Service
$
Electrical Permit
$
Plumbing Permit
$
Site Inspection Signature Card
$
Well & Water Test

$Included in Building Permit

*Additional Permit Fee- $35.00 each occurrence

Text Box: Note: All required permits must be obtained prior to starting work on that discipline. Note: All required documentation must be on file prior to making application for Occupancy Permit. Note: All required inspections must be completed prior to making an application for Occupancy Permit. Note: Site inspection signature card must be displayed viewable from the street during all phases of your project.


Inspections Required
Excavation
Footing
Foundation
Framing
Electric -Rough
Electric -Finish
Plumbing –Rough
Plumbing -Finish
Insulation
Chimney
Fireplace
Service (Electric Meter)
Water & Waste Disposal
Heat (Burner Inspection)
Driveway
Final Inspection (Occupancy)

<Back to Town of Wilton Home Page>